Skip to product information
1 of 4

Wild Witch Designs

Hex The Patriarchy Women's Curved Hem T-shirt (Plus Size)

Hex The Patriarchy Women's Curved Hem T-shirt (Plus Size)

Regular price $30.38 USD
Shipping calculated at checkout.
Size
Color
Quantity

Witch, please — it’s time to Hex the Patriarchy and look damn good doing it. This women's tee brings the magic with a classic crew neck, curved hem, and a fit that flatters without sacrificing comfort. Made from a soft, stretchy jersey blend (95% polyester / 5% spandex), it’s breathable enough for summer heat or heated debates.

Whether you're chanting in the streets, brewing up justice, or just vibing in everyday rebellion, this shirt keeps you cool, comfy, and clearly on the side of change.

Features:

  • Soft, lightweight jersey fabric

  • Curved hem for a flattering silhouette

  • Short sleeves + classic round neck = effortless style

  • Easy-care: machine wash cold, tumble dry low, no ironing needed

Because smashing the patriarchy is a full-time job — you might as well look magical doing it.

Size Guide

 

Inch L XL 2XL 3XL 4XL 5XL
Length 27.4  28.0  28.5  29.1  29.7  30.3 
Bust 44.9  47.2  49.6  52.0  54.3  56.7 
Sleeve 9.7  10.2  10.7  11.3  11.8  12.3 

 

Centimeter L XL 2XL 3XL 4XL 5XL
Length 69.5  71.0  72.5  74.0  75.5  77.0 
Bust 114.0  120.0  126.0  132.0  138.0  144.0 
Sleeve 24.7  26.0  27.3  28.6  29.9  31.2 

 

This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".

View full details